Fast colour change at SMM
SMM · Deux-Sèvres (79), Nouvelle-Aquitaine · 2023
Chair manufacturer · WAGNER Flexi Center powder coating booth and powder centre · Assembled during the Christmas shutdown
Ten days between Christmas and New Year. That is the window SMM, a chair manufacturer in the Deux-Sèvres, gave us to assemble its new powder coating booth and its WAGNER Flexi Center powder centre.
On furniture, series are short and colours change often. The Flexi Center is made for that: a colour change takes four minutes, against seven minutes on a SuperCenter EVO. But everything still has to be ready when the workshop reopens, on the first working day of January.
What we did
The result
✓ An installation assembled within the shutdown window, without a single day's delay. ✓ A colour change in four minutes, against seven on a SuperCenter EVO. ✓ Long-term follow-up: CREDO remains the site's contact for maintenance and parts.
In pictures
Many thanks to the SMM teams for their trust and for the flawless organisation of this shutdown window.
A line project, a retrofit or a part to find: use the contact form or call +33 4 38 61 25 77.
Jérôme Gautier, Managing Director, CREDO ENGINEERING FRANCE